Bug 21003

Summary: DispatchOperation: assumes that HandleWith will succeed
Product: Telepathy Reporter: Simon McVittie <smcv>
Component: mission-controlAssignee: Simon McVittie <smcv>
Status: RESOLVED FIXED QA Contact: Telepathy bugs list <telepathy-bugs>
Severity: normal    
Priority: medium Keywords: patch
Version: unspecified   
Hardware: Other   
OS: All   
URL: http://git.collabora.co.uk/?p=user/smcv/telepathy-mission-control-smcv.git;a=shortlog;h=refs/heads/wait-for-handlers
Whiteboard:
i915 platform: i915 features:
Bug Depends on: 23651    
Bug Blocks:    

Description Simon McVittie 2009-04-01 11:33:10 UTC
HandleWith is meant to wait for HandleChannels to succeed, and only return successfully if HandleChannels does. Instead, in MC 5 the channel dispatch operation finishes immediately.
Comment 1 Simon McVittie 2009-10-28 15:10:31 UTC
My wait-for-handlers branch requires prefer-preferred-handler. Another one on the chain...
Comment 2 Simon McVittie 2009-11-02 10:39:16 UTC
Fixed in git

Use of freedesktop.org services, including Bugzilla, is subject to our Code of Conduct. How we collect and use information is described in our Privacy Policy.